Mosier, Gary E.

rss
  1. Stahl H, Postman M, Abplanalp L, Arnold W, Blaurock C, Egerman R, Mosier G. ADVANCED MIRROR TECHNOLOGY DEVELOPMENT (AMTD) PROJECT: 2.5 YEAR STATUS. In: SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE. Conference on Space Telescopes and Instrumentation - Optical, Infrared, and Millimeter Wave; JUN 22-27, 2014; Montreal, CANADA. 2014. p. 6.
    Publication Details
  2. Stahl H, Postman M, Mosier G, Smith W, Blaurock C, Ha K, Stark C. AMTD: UPDATE OF ENGINEERING SPECIFICATIONS DERIVED FROM SCIENCE REQUIREMENTS FOR FUTURE UVOIR SPACE TELESCOPES. In: SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE. Conference on Space Telescopes and Instrumentation - Optical, Infrared, and Millimeter Wave; JUN 22-27, 2014; Montreal, CANADA. 2014. p. 8.
    Publication Details
  3. Feinberg L, Jones A, Mosier G, Rioux N, Redding D, Kienlen M. COST-EFFECTIVE AND SERVICEABLE ATLAST 9.2M TELESCOPE ARCHITECTURE. In: SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE. Conference on Space Telescopes and Instrumentation - Optical, Infrared, and Millimeter Wave; JUN 22-27, 2014; Montreal, CANADA. 2014. p. 11.
    Publication Details
  4. Lyon R, Oegerle W, Feinberg L, Bolcar M, Dean B, Mosier G, Postman M. CORONAGRAPHIC WAVEFRONT CONTROL FOR THE ATLAST-9.2M TELESCOPE. In: SPACE TELESCOPES AND INSTRUMENTATION 2010: OPTICAL, INFRARED, AND MILLIMETER WAVE. Conference on Space Telescopes and Instrumentation 2010 - Optical, Infrared, and Millimeter Wave; JUN 27-JUL 02, 2010; San Diego, CA. 2010. p. 9.
    Publication Details
  5. Menzel M, Bussman M, Davis M, Golnik G, Irish S, Lawrence J, Lynch R, Maghami P, Markley L, Mehalick K, Mosier G, Muheim D, Parrish K, Thomson S, Geithner P, Pitman J, Wehner J, Arenberg J, Costanza B, Anandakrishnan S, Burt B, Hejal R. SYSTEMS ENGINEERING ON THE JAMES WEBB SPACE TELESCOPE. In: MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY IV. Conference on Modeling, Systems Engineering and Project Management for Astronomy IV; JUN 27-JUL 01, 2010; San Diego, CA. 2010. p. 13.
    Publication Details
  6. Muheim D, Menzel M, Mosier G, Howard J, Irish S, Maghami P, Mehalick K, Parrish K, Pitman J, Thomson S, Asuquo C, Blaurock C, Congedo C, Ha K, Holmes N, Liu F, McGinnis M, Mariconti S, May C, Russell B, Sanders J, Shiri S, Smith J, Skelton D. UPDATE ON THE ROLE OF SYSTEMS MODELING IN THE DESIGN AND VERIFICATION OF THE JAMES WEBB SPACE TELESCOPE. In: MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY IV. Conference on Modeling, Systems Engineering and Project Management for Astronomy IV; JUN 27-JUL 01, 2010; San Diego, CA. 2010. p. 13.
    Publication Details
Viewing All
Displaying publications 1 to 6 (6 total)